Estimasi Biaya Membangun Villa Mewah 2020 2021,desain villa tropis, desain villa tropis bali, desain villa tropis asri, desain villa tropis modern, desain villa tropis kontemporer, gambar desain villa tropis, gambar desain villa tropis modern, jasa desain villa tropis modern, jasa desain villa tropis minimalis, jasa desain villa tropis, jasa desain villa tropis minimalis sederhana,
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021
Berikut Ulasan Video 3D Review Villa Mewah 2 Lantai :
jasa desain villa tropis asri, jasa desain villa tropis klasik, jasa desain villa tropis bali, jasa desain villa tropis 2 lantai, jasa desain villa tropis modern 1 lantai, jasa desain villa tropis sederhana, arsitektur desain villa tropis, villa tropis modern, villa tropis minimalis, villa tropis ii lantai, villa tropis 2 lantai, villa tropis 1 lantai, villa tropis sederhana, villa tropis bali, villa tropis modernistic minimalis, villa tropis minimalis 2 lantai, villa tropis minimalis 1 lantai, villa tropis modern 2 lantai, contoh villa tropis modernistic,
Estimasi Biaya Bangun Villa Mewah 2 Lantai 2020 2021
Pada Pembahasan kali ini kami Asia Arsitek akan membagikan Hitungan Biaya membangun Villa Mewah two Lantai.
Villa adalah tempat yang mungkin jauh dari keramaian dan hanya tempat singgah untuk sementara. Biasanya villa berada di pegunungan yang udaranya sejuk dan tergolong sangat nyaman.
Bagi anda yang sedang berencana untuk memiliki Villa sebagai
private business firm
anda. Tentu artikel kali ini akan sangat berguna dan sangat direkomendasikan untuk anda.
###############
BACA SAMPAI TUNTAS
###############
Villa Mewah two Lantai
Jika anda ingin membangun villa, Anda harus memiliki konsep dan perencanaan yang matang. Karena biasanya villa berada di pegunungan / dataran tinggi, maka kemungkinan akan memakan biaya banyak dalam hal seperti :
- Mendatangkan Kontraktor
- pengiriman Material
- dan lain- lain
Untuk lebih mudahnya, kami akan memberikan contoh hitungan
Existent
( Nyata ) dari Projek Asia Arsitek yang telah masuk dalam proses pembangunan.
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021
GAMBAR VILLA MEWAH ii LANTAI ( GAMBAR PERENCANAAN )
Desain Eksterior.
Berikut Desain 3D Eksterior Villa Mewah ii Lantai.
Gambar View Tampak Depan
Gambar Tampak Depan
Gambar View Kolam Ikan
Gambar View Tampak Belakang
Gambar View Tampak Atas
Gambar View Tampak Belakang
Desain Interior.
Berikut Desain 3D Interior Villa diatas.
Gambar View Ruang Keluarga
Gambar View Ruang Keluarga
Gambar View Ruang Tidur
Gambar View Ruang Tidur
Gambar View Ruang Makan
Gambar View Ruang Keluarga
Information Ukuran.
berikut data ukuran Villa diatas :
A). Data UKURAN TANAH :
» Lebar Tanah : fourteen m
» Panjang Tanah : 41 m
» Luas Tanah : 574 yard²
B). Information UKURAN BANGUNAN :
» Luas Basement : 56 m² ( meter persegi )
» Luas Lantai 1 : 94 m² ( meter persegi )
» Luas Lantai 2 : 93,4 yard² ( meter persegi )
» Luas Bangunan : 243,4 one thousand² ( meter persegi )
» fee desain arsitek : Rp. 24.340.000,-
FASILITAS :
LANTAI BASEMENT
- Teras
- Ruang Keluarga
- Ruang Tidur 1 + KM
- Ruang ART
- Kamar Mandi / WC
LANTAI one
- Carport i Mobil
- Teras
- Ruang Tamu
- Ruang Tidur 3 + KM
- Pantry
- Ruang Makan
- Ruang Keluarga
- Ruang Tidur 2
- Kamar Mandi / WC
- Balkon
LANTAI two
- Dak
- Balkon
- Ruang Tidur five
- Ruang Tidur 6
- Kamar Mandi / WC
- Ruang Duduk
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021
Berikut ini merupakan detail dari kebutuhan material rumah yang harus disiapkan ketika anda ingin memiliki villa mewah model seperti ini :
DAFTAR KEBUTUHAN MATERIAL & PEKERJAAN ALAT BANTU
A. PEKERJAAN PASANGAN, PONDASI DAN BETON BERTULANG
No | Nama Bahan Fabric | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
A | PEKERJAAN PASANGAN, PONDASI DAN | ||||
BETON BERTULANG | |||||
1 | Batu Bata Merah | 3574 | bh | 600 | 2.144.400 |
2 | Bata Ringan Lokal T 10 cm | 63 | m3 | 600.000 | 37.570.260 |
3 | Roster (xx×20) | 0 | bh | 12.200 | – |
4 | Split Beton 2/three | 107 | m3 | 180.500 | 19.232.281 |
five | Besi Beton Polos 8mm | 146 | btg | 43.117 | 6.288.746 |
vi | Besi Beton Polos 10mm | 39 | btg | 67.314 | 2.631.499 |
7 | Besi Beton Polos 12mm | 31 | btg | 97.333 | iii.034.580 |
8 | Besi Beton Ulir D 10 mm | 623 | btg | 67.732 | 42.225.994 |
9 | Besi Beton Ulir D 13 mm | 0 | btg | 113.706 | – |
10 | Besi Beton Ulir D 16 mm | 1176 | btg | 173.907 | 204.576.663 |
11 | Weirmesh M8 | 1555 | m2 | 48.501 | 75.416.718 |
12 | Plywood Tebal 9 mm | 406 | lbr | 104.000 | 42.187.960 |
13 | Dolken Ø-8-10/4m | 1909 | btg | 22.000 | 41.994.432 |
fourteen | Minyak Begisting | 174 | ltr | 15.000 | ii.607.772 |
15 | Bondex | 1555 | m2 | 100.050 | 155.573.308 |
16 | Formite/spacer | 6158 | bh | v.000 | 30.791.200 |
17 | Kawat Beton | 317 | kg | 23.000 | 7.283.931 |
18 | Kawat Las | 526 | kg | 27.000 | 14.200.780 |
19 | Kawat Las Nikko | 0 | bh | 700 | – |
twenty | Paku biasa 2″-five″ | 456 | kg | 17.500 | 7.973.211 |
21 | Paku Hak Panjang fifteen cm | 0 | kg | 75.000 | – |
22 | Seng Gelombang | 133 | lbr | 25.000 | 3.325.200 |
23 | Meni Besi | 50 | kg | 44.500 | 2.219.571 |
24 | Pasir Beton | 0 | m3 | 250.000 | 120.000 |
25 | Pasir Beton Cilegon | 62 | m3 | 250.000 | 15.525.043 |
26 | Pasir Urug | 1 | m3 | 170.000 | 109.140 |
27 | Pasir Urug Cilegon | 17 | m3 | 170.000 | 2.956.916 |
28 | Pasir Pasang Putih Rangkas | 37 | m3 | 220.000 | 8.133.036 |
29 | Urugan Kerikil 3/v | three | m3 | 193.000 | 607.950 |
xxx | Tanah Urug Pilihan | 0 | m3 | 200.000 | – |
31 | Anti Rayap Tanah | 234 | m2 | 18.750 | iv.387.500 |
32 | Pas Ijuk | 16 | kg | 25.000 | 405.000 |
33 | HCL | 0 | ltr | 45.000 | – |
34 | Opening Untuk kusen allumunium dan Kayu/PVC & Garasi | 296 | m1 | 16.260 | four.817.838 |
35 | Semen Tiga Roda 50 kg | 1322 | zak | 64.500 | 85.288.993 |
36 | Semen Warna | 295 | kg | 12.500 | 3.692.052 |
37 | Semen MU perekat bata ringan | 66 | zak | 84.000 | 5.522.828 |
38 | Beton K 250 Jaya Mix | 174 | m3 | 840.000 | 146.553.120 |
39 | Sewa Pompa Beton | 166 | m3 | 160.000 | 26.585.600 |
40 | Crawler crane lengkap | 0 | jam | 1.078.774 | – |
41 | Besi pelat | 0 | kg | 7.000 | – |
42 | Tiang Pancang 20X20 cm | 0 | m1 | 147.000 | – |
Total | 1.005.983.522 | ||||
B. PEKERJAAN KAYU UNTUK BEKISTING, RANGKA ATAP DAN PLAFOND
No | Nama Bahan Textile | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
B | PEKERJAAN KAYU UNTUK BEKISTING, | ||||
RANGKA ATAP DAN PLAFOND | |||||
one | Kayu Balok five/vii/3 albasia | nine | m3 | 2.000.000 | 18.621.120 |
2 | Kayu Papan albasia 2/20/3 | 1 | m3 | two.083.333 | 1.616.417 |
3 | Balok Kayu v/7 kelas Iii | 30 | m3 | 2.000.000 | 60.826.494 |
four | Balok Kayu Kelas 3 | 17 | m3 | 2.000.000 | 33.991.892 |
v | Steger Alat Bantu Kerja | 2 | ls | 57.500 | 115.000 |
TOTAL | 115.170.923 |
C. PEKERJAAN KUSEN, PINTU DAN JENDELA
No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
C | PEKERJAAN KUSEN, PINTU DAN JENDELA | ||||
1 | 1 Unit Pek. Pintu Lipat ( PL ) | 1 | unit | 9.867.859 | 9.867.859 |
two | i Unit Pek. Pintu Jendela 1 ( PJ1 ) | ane | unit | 8.465.666 | 8.465.666 |
3 | 1 Unit of measurement Pek. Pintu Jendela 2 ( PJ2 ) | 2 | unit | 7.660.697 | fifteen.321.394 |
iv | 1 Unit of measurement Pek. Pintu Jendela three ( PJ3 ) | 2 | unit | 6.830.459 | 13.660.918 |
five | 1 Unit Pek. Pintu ( P1 ) | 6 | unit | 3.033.514 | 18.201.084 |
6 | 1 Unit of measurement Pek. Pintu ( P2 ) | five | unit of measurement | 2.613.033 | 13.065.165 |
7 | 1 Unit of measurement Pek. jendela ( J1 ) | one | unit | 6.108.299 | 6.108.299 |
8 | 1 Unit Pek. jendela ( J2 ) | 2 | unit | 7.190.907 | 14.381.814 |
9 | 1 Unit of measurement Pek. jendela ( J3 ) | 5 | unit | v.554.403 | 27.772.015 |
ten | 1 Unit Pek. Jendela ( J4 ) | 1 | unit | 4.967.223 | 4.967.223 |
11 | 1 Unit Pek. Jendela ( J5 ) | 3 | unit | 5.297.928 | 15.893.784 |
12 | 1 Unit Pek. Jendela ( J6 ) | 1 | unit | 3.800.622 | 3.800.622 |
13 | 1 Unit Pek. Jendela ( J7 ) | 1 | unit | 6.836.139 | 6.836.139 |
14 | 1 Unit Pek. Jendela ( J8 ) | 2 | unit | xiii.205.510 | 26.411.020 |
xv | 1 Unit Pek. Jendela ( J9 ) | 2 | unit | 1.271.154 | 2.542.308 |
16 | i Unit Pek. Jendela ( BV1 ) | i | unit of measurement | 808.247 | 808.247 |
17 | 1 Unit Pek. Jendela ( BV2 ) | 1 | unit | 797.389 | 797.389 |
TOTAL | 188.900.946 |
D. PEKERJAAN KUNCI DAN ENGSEL
No | Nama Bahan Fabric | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
D | PEKERJAAN KUNCI DAN ENGSEL | ||||
1 | Kunci Tanam di Handle | 16 | bh | 180.000 | 2.880.000 |
2 | Kunci Tanam di Samping | 6 | bh | 93.000 | 558.000 |
3 | Kunci Grendel Jendela | 0 | bh | 55.000 | – |
four | Kunci Allumunium Rambuncis | xx | bh | 28.000 | 560.000 |
5 | Engsel Jendela Kupu-kupu | 0 | ps | 39.500 | – |
6 | Engsel Jendela Casement | 20 | ps | 46.500 | 930.000 |
7 | Engsel Pintu Kupu-kupu | 34 | ps | 133.000 | 4.522.000 |
8 | Kait Angin | 20 | ps | 20.000 | 400.000 |
nine | Door Closer | 0 | bh | 274.000 | – |
x | Pegangan Pintu/Door Holder | 0 | bh | 120.000 | – |
11 | Asesoris Sliding | 0 | bh | 165.000 | – |
12 | Handle Pintu Single | ten | ps | 210.000 | 2.100.000 |
13 | Handle Pintu Double | v | ps | 465.000 | 2.325.000 |
Total | fourteen.275.000 |
Due east. PEKERJAAN ATAP GENTENG
No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
Eastward | PEKERJAAN ATAP GENTENG | ||||
1 | Aluminum foil / Sisalation | 0 | m2 | 14.500 | – |
2 | Genteng Bitumen CTI | 0 | m2 | 195.000 | – |
three | Nok Standard Allumunium | 0 | bh | 20.000 | – |
4 | Nok Ujung | 0 | bh | 25.000 | – |
5 | Nok 3 Way | 0 | bh | 25.000 | – |
6 | primary truss C-75-75 | 0 | m1 | xiv.667 | – |
vii | Roof Bottom/ reng R 33-0.45 | 0 | m1 | 10.000 | – |
8 | Trus Screw dia half-dozen×20 mm | 0 | bh | 400 | – |
9 | Roof lesser screw | 0 | bh | 350 | – |
10 | Dynabol dia 12x120mm | 0 | bh | xv.000 | – |
11 | Atap Akrilik | 0 | m2 | 950.000 | – |
12 | Kaca Tempered 10 mm | seven | m2 | 105.000 | 752.850 |
TOTAL | 752.850 |
F. PEKERJAAN CAT / FINISHING
No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
F | PEKERJAAN True cat / FINISHING | ||||
1 | Amplas | fourscore,996 | lbr | ten.000 | 809.960 |
2 | Cat Dasar | 98 | kg | 44.204 | 4.353.572 |
three | Cat penutup 2x setara ICI / Dulux | 256 | kg | 94.000 | 24.070.516 |
iv | Cat tembok setara ICI / Dulux | 32 | kg | 88.125 | 2.855.109 |
five | Plamir Tembok | 26 | kg | 44.000 | 1.140.424 |
6 | Rol Cat | two | bh | 34.500 | 55.887 |
seven | Steger Werk | 162 | ls | i.000 | 161.992 |
8 | Pre Treatment / cleaning | eleven | m2 | 5.000 | 54.284 |
9 | Curbing Sudut | 4 | m1 | 35.000 | 151.996 |
10 | Sika Water Proofing 107 Seal + cairan | 11 | m2 | 31.333 | 357.191 |
Total | 34.010.932 |
G. PEKERJAAN PLAFOND
No | Nama Bahan Cloth | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
G | PEKERJAAN PLAFOND | ||||
1 | List Profil Gypsum (ii.2m/Bt) | 15,645 | m1 | 10.000 | 156.450 |
ii | Gypsum lath ( 120 10 240 x 9 ) mm | 48 | lbr | 65.000 | 3.151.559 |
three | Gypsum WR ( 120 x 240 10 iv ) mm | 3 | lbr | 95.000 | 313.295 |
iv | GRC | 0 | m2 | 75.833 | – |
5 | Kalsiboard ( 120 x 240 x four ) mm | 24 | lbr | 32.500 | 786.222 |
6 | Compound | 26 | zak | 90.000 | 2.348.123 |
7 | Cotton Plaster | 15 | bh | thirteen.000 | 195.364 |
8 | Sekrup | 0 | kg | 50.000 | – |
9 | Sekrup gypsum | 22 | kg | 75.000 | 1.636.667 |
x | Sekrup GRC | 8 | kg | 75.000 | 623.040 |
xi | Paku GRC | 0 | kg | 58.500 | – |
12 | Tepung Gypsum | 2 | kg | 4.500 | ten.058 |
13 | Kawat Pengait | 223 | is | 2.000 | 445.550 |
14 | Conwood ( 200x3050x11 ) mm | 0 | lbr | – | – |
fifteen | Hollow 2×iv | 38 | Btg | 45.000 | 1.731.524 |
16 | Hollow 4×4 | 88 | Btg | 69.000 | 6.069.142 |
Total | 17.466.992 |
H. PEKERJAAN LANTAI, DINDING KERAMIK DAN BATU ALAM
No | Nama Bahan Cloth | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
H | PEKERJAAN LANTAI, DINDING KERAMIK | ||||
DAN BATU ALAM | |||||
1 | Keramik sixty ten 60 cm setara Roman Granite | 0 | m2 | 500.000 | – |
2 | Keramik 30 ten 60 cm setara Roman Granit | 68 | m2 | 130.000 | 8.891.298 |
3 | Granite tile 100 x 100 cm setara Indogress | 214 | m2 | 500.000 | 107.210.250 |
four | Plint Granite tile 10 ten 100 cm setara Indogress | 5 | m2 | 500.000 | 2.266.000 |
v | Granite tile 60 x 60 cm setara Roman Granit | i | m2 | 170.000 | 178.500 |
6 | Keramik 40 ten 40 cm setara KIA Monza | 4 | m2 | 82.000 | 301.350 |
7 | Keramik 40 x 40 cm setara KIA Monza | 0 | m2 | 61.000 | – |
8 | Keramik 30 x 30 cm setara Roman | xvi | m2 | 43.000 | 706.146 |
9 | WPC Deck | 22 | m2 | 775.000 | 17.034.500 |
Full | 136.588.044 |
I. PEKERJAAN BESI
No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
I | PEKERJAAN BESI | ||||
1 | Besi Hollow 20 x twenty x 0,viii mm | 24,29109116 | btg | 44.620 | 1.083.868 |
ii | Besi Hollow twenty 10 40 10 0,vi mm | 20 | btg | 45.000 | 913.048 |
3 | Besi Hollow forty X forty x 0,half-dozen mm | 13 | btg | 69.000 | 913.815 |
4 | Besi Hollow l X 100 ten ane,7 mm | one | k’ | 373.750 | 500.434 |
v | bolt a325n | 66 | bh | 25.000 | 1.643.527 |
6 | Besi Baja I WF 200 x 100 x five,7 x 8 mm – 12 M | 21 | m’ | 170.083 | three.524.127 |
7 | Alat Bantu (bor)/genset | 56 | ls | five.000 | 281.250 |
viii | Sewa alat las | 93 | jam | 56.250 | 5.212.586 |
Full | xiv.072.655 |
J. PEKERJAAN INSTALASI LISTRIK DAN TITIK LAMPU
No | Nama Bahan Textile | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
J | PEKERJAAN INSTALASI LISTRIK DAN | ||||
TITIK LAMPU | |||||
1 | Lampu Downwards Low-cal | 58 | bh | 58.000 | 3.364.000 |
2 | Lampu Pijar 12 Watt | 5 | bh | 91.000 | 455.000 |
three | Lampu Pijar eighteen Watt | 16 | bh | 145.000 | ii.320.000 |
4 | Lampu Dinding | eleven | bh | 174.000 | 1.914.000 |
v | Lampu Gantung Minimalis | 0 | bh | 4.200.000 | – |
6 | Lampu Taman-SL26W | 7 | bh | 315.000 | ii.205.000 |
7 | MCB 6A | xiii | bh | 44.588 | 579.644 |
8 | Box Sekering 12 Group | two | bh | 40.000 | 80.000 |
nine | Arde Pentanahan | 1 | unit of measurement | iii.750.000 | three.750.000 |
ten | Sparing Kabel SR PLN | 40 | m1 | xxx.000 | one.200.000 |
eleven | Conduit pipa dia. twenty setara Clipsal | 543 | m | three.200 | 1.738.464 |
12 | Kabel NYM 2,5×1,5 mm2 setara Eterna | 194 | m | vii.423 | 1.440.729 |
xiii | Kabel NYM 3×two,v mm2 setara Eterna | 336 | yard | 10.584 | 3.554.531 |
14 | Kabel NYM 3×ii,v mm2 setara Supreme | 21 | m | eleven.960 | 251.160 |
15 | Kabel Coaxial 5V-2C setara Federa | 35 | m | seven.750 | 268.538 |
16 | Exhaust Fan | 4 | bh | 255.000 | ane.020.000 |
17 | Splitter 6 port | 3 | bh | 60.000 | 180.000 |
18 | Saklar Ganda setara Broco | ix | bh | xiii.412 | 120.708 |
19 | Saklar tunggal setara Broco | 10 | bh | 9.870 | 98.700 |
20 | Saklar Triple setara Broco | two | bh | 17.493 | 34.986 |
21 | Saklar Seri Isi 4 | 4 | bh | 73.626 | 294.504 |
22 | Saklar Hotel one Gang | 4 | bh | 23.440 | 93.760 |
23 | Cover Penutup Finish Kontak (di area wastafel) | v | bh | 37.500 | 187.500 |
24 | Finish KONTAK BROCO G155SM55 | 0 | bh | 31.700 | – |
25 | Stop Kontak 13A setara Broco | 62 | bh | 17.367 | ane.076.754 |
26 | Stop Kontak Water Heater (Air conditioning) | 7 | bh | 49.623 | 347.361 |
Total | 26.575.338 |
One thousand. PEKERJAAN SANITASI DAN INSTALASI SALURAN AIR
No | Nama Bahan Material | Jumlah | Satuan | Harga Satuan (Rp) | Jumlah Harga (Rp) |
---|---|---|---|---|---|
K | PEKERJAAN SANITASI DAN INSTALASI | ||||
SALURAN AIR | |||||
i | Closet duduk TOTO CW 421 | five | bh | 2.590.000 | 12.950.000 |
two | Closet jongkok TOTO CE 7 | 0 | bh | 384.000 | – |
3 | wastafel Setara TOTO LW 824 CJ (besar) | 4 | unit | one.050.000 | 4.200.000 |
4 | wastafel setara TOTO LW 247 CJ | i | unit | 295.000 | 295.000 |
5 | Pipa pvc Ø 1/2″ | 125 | m1 | five.850 | 728.676 |
6 | Pipa pvc Ø ane″ | 35 | m1 | ix.900 | 349.153 |
7 | Flexible Ducting Ø4″ setara Defa Flex | 0 | m1 | 24.500 | – |
eight | Pipa pvc Ø iii″ | 80 | m1 | 23.800 | 1.902.096 |
9 | Pipa pvc Ø 4″ | 226 | m1 | 81.025 | xviii.316.187 |
10 | Pipa pvc Ø 3/4″ | 8 | m1 | 7.388 | threescore.282 |
11 | Pipa PVC 4″ jenis AW | xvi | m1 | 157.596 | 2.553.055 |
12 | Pipa GIP 1 1/2″ | fifteen | m1 | 194.140 | 2.912.100 |
13 | Pipa PVC four″ berlubang jenis AW | 27 | m1 | 81.025 | 2.187.675 |
14 | Kran air TOTO T23B13V7NB | half-dozen | bh | 311.000 | 1.866.000 |
15 | Kran air TOTO Gear up + Shower TX432SD | 5 | bh | five.000 | 25.000 |
16 | Kran air Setara TOTO TX603KM (kran leher angsa) | i | bh | 100.000 | 100.000 |
17 | Kran Ballvave Setara Ondo | 4 | bh | 23.000 | 92.000 |
18 | Floor drain TX1BN | 17 | bh | 55.000 | 935.000 |
xix | Roof drain San – Ei H01 4 inch | 8 | bh | nineteen.000 | 152.000 |
20 | Bak cuci stainless steel + asesoris lengkap (zink dapur) | 1 | bh | 1.350.000 | 1.350.000 |
21 | Bak fibreglass kapasitas i m3 setara Penguin | 0 | bh | one.200.000 | – |
22 | Seal tape | i | bh | v.000 | 2.625 |
23 | Water Heater Ariston 9L | 4 | bh | two.190.000 | 8.760.000 |
24 | Solar Rut 300 Fifty | 0 | bh | 31.000.000 | – |
25 | Shower Box sliding | 4 | bh | ii.100.000 | eight.400.000 |
26 | Jet Shower Setara TOTO THX20MCRB | 5 | bh | 240.000 | 1.200.000 |
27 | Grundfos JD Bones 7 jet pump 60m | ane | bh | eight.448.000 | 8.448.000 |
28 | Sealant Closet & Wastafel | 2 | ls | 375.000 | 750.000 |
29 | Alat bantu lem, sok, keni dll | ii | ls | 1.000.000 | two.000.000 |
TOTAL | 80.534.850 |
Total HARGA KEBUTUHAN MATERIAL : Rp,- 1.634.332.052,-
Data diatas hanya menggambarkan kebutuhan material-fabric bangunan dasar yang harus disiapkan, diluar ongkos tenaga dan biaya lainnya.
Baca Juga :
»
Jasa Desain Villa Mewah di Surabaya
»
Jasa Desain Villa Mewah di Jakarta
» Jasa Desain Villa Mewah di Bogor Jawa Barat
Estimasi Biaya Membangun Villa Mewah ii Lantai 2020 2021
Berikut adalah rekapitulasi lengkap biaya membangun rumah mewah diatas :
REKAPITULASI RENCANA ANGGARA BIAYA
PEMBANGUNAN VILLA MEWAH
No. | URAIAN PEKERJAAN | JUMLAH HARGA (Rp) | JUMLAH HARGA Full (Rp) |
---|---|---|---|
I | Pekerjaan Persiapan | 76.395.874 | 76.395.874 |
2 | Pekerjaan Galian Tanah & Urugan | 34.527.701 | 34.527.701 |
Three | Pekerjaan Struktur Beton Bertulang | ||
A. Lantai i & Pondasi | 432.685.360 | ||
B. Lantai 2 | 477.273.377 | ||
C. Lantai Atap | 416.082.149 | one.326.040.886 | |
IV | Pekerjaan Dinding | ||
A. Lantai i | 63.058.968 | ||
B. Lantai 2 | 91.799.908 | ||
C. Lantai Atap | 35.624.941 | 190.483.817 | |
Five | Pekerjaan Atap | v.646.268 | 5.646.268 |
VI | Pekerjaan Kusen, Pintu dan Jendela | ||
A. Lantai 1 | 39.326.962 | ||
B. Lantai ii | 81.497.997 | ||
C. Lantai Atap | 68.075.978 | 188.900.937 | |
VII | Pekerjaan Engsel dan Kunci | xix.484.600 | 19.484.600 |
Eight | Pekerjaan Instalasi Air & Sanitari | ||
A. Lantai 1 | lx.787.978 | ||
B. Lantai 2 | 83.626.621 | 144.414.598 | |
Nine | Pekerjaan Plafond | ||
A. Lantai i | 1.256.329 | ||
B. Lantai two | nineteen.127.187 | 20.383.517 | |
Ten | Pekerjaan Keramik Lantai & Dinding | ||
A. Pasangan Keramik Lantai 1 | 47.657.012 | ||
B. Pasangan Keramik Lantai 2 | 132.462.153 | ||
C. Pasangan Dinding Keramik Lantai i | vii.185.122 | ||
D. Pasangan Dinding Keramik lantai 2 | viii.418.195 | ||
E. Pasangan Keramik lantai Atap | 4.447.051 | 200.169.533 | |
XI | Pekerjaan Instalasi Listrik | ||
A. Lantai one | xx.368.338 | ||
B. Lantai 2 | 49.358.296 | ||
C. Instalasi Telepon + Instalasi TV | iv.550.673 | 74.277.307 | |
XII | Pekerjaan Pengecatan | ||
A. Lantai one | fourteen.127.412 | ||
B. Lantai ii | 25.730.576 | ||
C. Lantai Atap | viii.128.330 | 47.986.318 | |
13 | Pekerjaan Lain – Lain | 102.045.010 | 102.045.010 |
Full = | 2.430.756.366 | 2.430.756.366 | |
FEE KONTRAKTOR (10%) = | 243.075.637 | ||
PPN / TAX = | by Owner | ||
GRAND Full = | 2.673.832.003 | ||
ROUNDED = | 2.673.000.000 | 3.353.827 |
Hitungan Biaya Bangun Rumah Diatas Per meter persegi ( m² )
» Rp 2.673.000 ,- : 797 yard² = Rp three.353.827 per one thousand²
Jadi, rencana pembangunan rumah tinggal diatas direncanakan dibangun dengan biaya Rp per g² ( meter persegi )
Baca Juga :
» Villa Desain Tropis Mewah
» Jasa Desain Villa Mewah Di Taman Dayu Pandaan
» Jasa Desain Villa Private House Mewah di Ciampea Bogor
VIDEO 3D VILLA LAINNYA – ASIA ARSITEK
Video one
Video 2
Video 3
Bagi anda yang sedang berencana membangun rumah tinggal baik itu sederhana, minimalis, modern atau pun mewah. Kami Asia Arsitek merupakan penyedia jasa arsitek yang telah berpengalaman lebih dari 10 tahun.
Estimasi Biaya Membangun Villa Mewah 2 Lantai 2020 2021
INFO LEGKAP MENGENAI KAMI » HUBUNGI KAMI «
TAG :
desain villa tropis, desain villa tropis bali, desain villa tropis asri, desain villa tropis mod, desain villa tropis kontemporer, gambar desain villa tropis, gambar desain villa tropis mod, jasa desain villa tropis modern, jasa desain villa tropis minimalis, jasa desain villa tropis, jasa desain villa tropis minimalis sederhana, jasa desain villa tropis asri, jasa desain villa tropis klasik, jasa desain villa tropis bali, jasa desain villa tropis 2 lantai, jasa desain villa tropis modern i lantai,
jasa desain villa tropis sederhana, arsitektur desain villa tropis, villa tropis modern, villa tropis minimalis, villa tropis ii lantai, villa tropis 2 lantai, villa tropis ane lantai, villa tropis sederhana, villa tropis bali, villa tropis modernistic minimalis, villa tropis minimalis two lantai, villa tropis minimalis 1 lantai, villa tropis modern ii lantai, contoh villa tropis modernistic,
contoh villa tropis minimalis, contoh villa tropis 1 lantai, contoh villa tropis lantai ii, contoh villa tropis minimalis i lantai, biaya desain villa tropis modern, biaya desain villa tropis minimalis, biaya desain villa tropis minimalis sederhana, biaya desain villa tropis asri, biaya desain villa tropis klasik, biaya desain villa tropis bali, biaya desain villa tropis 2 lantai, biaya desain villa tropis modern 1 lantai, biaya desain villa tropis 1 lantai, biaya desain villa tropis sederhana, desain villa tropis type 36,
ASIA ARSITEK
Biaya Bangun Rumah Stil Bali
Source: https://asiaarsitek.com/estimasi-biaya-membangun-villa-mewah-2-lantai-2020-2021/